acclimatize more and work on the tents at C2. The winds
have been very strong on the mountain and we have had to
be very patient. It looks like finally our summit window
will come next weekend with low winds predicted to begin
on the 21st and to last at least the 3 days we'll need!!
Wish us luck!
Catch up on all of the trip dispatches at:
www.fieldtouring.blogspot.com